How to Measure Quality in Construction Projects?

There is a very famous quote by Lord Kelvin, "If you cannot measure it, you cannot improve it." Time, cost, and quality are the key players in managing a project. Time and cost are quantitative, whereas quality is often referred to as a non-measurable parameter. This might not hold entirely true. Read through this to find out how to measure quality in construction projects.

What gets measured gets managed. Quality is a subjective matter, but fundamentally it means customer satisfaction, matching the standards, and fit for use.

One of the ways to improve quality or demonstrate the efficiency of good quality in the project is to measure it. It sounds simple, but unlike time or cost, there is no single measure of quality in construction projects to compare it with another.

What is a quality measure in construction?

Unlike the other two governing factors, i.e., time and cost, measuring construction quality is tricky.

In simple terms, the quality measurement can be seen as a level achieved after comparing the observed with the required standard. This degree of conformity is a tool that can make quality measurable.

This degree of conformity can be expressed in terms of several inspections that fail or pass the project's standard requirements.

In a project, to have a successful implementation and control of quality and to measure quality, a few parameters must be integrated together.

The first parameter is the plan of action which tells about the project and its functions.

The other parameter includes the organizational skills, tools, and practices used in the project.

The third and last parameter is work ethics and culture, which includes norms and the individuals' behavioral functions (Rad & Khosrowshahi, 1998).

When the above parameters are integrated, noticeable improvement will be achieved, which can facilitate the measurement of quality.

How do we measure quality in construction projects?

In construction, quality can often be subjective and vary from person to person. This very fact makes it difficult to quantify quality. However, two fundamental categories of measures are generally adopted to measure quality. They are prevention and resultant.

Preventive Quality Metrics

It is also known as the leading metric. In this implementation, preventive activities are done. Preventive actions include applying lessons learned from past experience, project-specific plans, reviews, aligning with client needs, pre- and post-activity meetings, continuous verification and evaluation, and analysis of risks.

This will proactively ensure and evaluate quality on site. These metrics allow the management to look ahead to an issue before it occurs. The focus of these metrics can be branched into two parts (CQEC, 2015):

First, in place quality

This metric evaluates the quality of the work being put in place to determine the percent correct. Typical best in class have a first in place quality of around 98%.

Quality Program Health

The ultimate goal is to use multiple data sources from a project to determine the project's quality program health.

This will require determining baselines and best in class for such items as:

  • Creation and upkeep of living quality plans
  • Submittal cycle times and number of cycles
  • RFI cycle times and number of cycles
  • Verification first in place quality

Predictive Quality Metrics/Resultant Quality Metrics

It is also known as lagging metrics. This metric is developed to capture an issue that occurs on-site because of improper implementation of the underlying quality process.

It considers quality incidents on a site, which is defined as something which should not happen during or after the construction of any project that is of good quality. By this quality incident rate, the number of hours worked on projects can be worked out. This is very similar to the already existing system in the safety program, where any injury is unacceptable and indicates the failure of the project safety process.

Traditional methods for measuring quality

Traditional approaches to measuring quality include the use of 'indicators of quality. As quality is a relative term, it is calculated based on indicators.

The quality indicators include punch list items, pre, and post-activity checklists, requests for information, inspection requests, and test reports. These are also known as key quality indicators.

Although these measuring techniques may not be wholesome but have generated thought and a notion that quality can be measured. These measures can be used for performance assessments and comparing different projects.

Towards a digital solution – DigiQC

Roots of traditional techniques give rise to advanced tools to measure the quality of construction projects. We here at DigiQC have come up with one such digital solution that simplifies this quality measurement work. It also generates analytical reports to keep track of the desired quality on site.

DigiQC helps you track down the inspections and record the number of passing or failing inspections which will become a factor in measuring the quality of the project. If you want to know more about this, schedule a demo for yourself or contact us.

You can also read the blog post on how digital technologies are changing the future of construction industries.

Conclusion

In this contemporary world where design and construction requirements are growing complex, managing quality becomes vital to handle modern-day building challenges. Using the correct tools and digital solutions for measuring the quality of construction, the construction industry will bring advancement and better work culture to produce a more efficient process of building contemporary facilities on time, within budget, and with the best quality.

Having reiterated the importance of quality in a construction project, measuring and quantifying quality become important. These new and advanced techniques must be applied to measure the quality and are promoted to get good results in improved quality standards in construction projects.

Want to know more about the QC software? CLICK HERE to schedule a demo.

Looking to improve your quality management? Check out the latest blog series from digiQC: Quality management in construction—An Overview for more details.

Want to have a demo of our Quality Management software trusted by Quality Conscious Companies like yours.
Book a demo

Explore More Blogs

April 18, 2024
A Comprehensive Guide to Electric Works in Construction

Electrical works involve the design, installation, and maintenance of electrical systems, ensuring safety, functionality, and efficiency. The process includes load calculations, wiring and circuit design, installation of fixtures and panels, and thorough testing to ensure compliance with safety standards.

June 5, 2022
Green Initiatives to Make Construction Industry Sustainable

On this World Environment Day, learn how going green in construction can benefit the environment and your business.

January 24, 2023
Most Recommended Is Codes For Aggregates In Construction

The complete guide on the importance and use of IS 10262: 2019